Products · Foundry

Know the real cost of every casting.

Built for iron foundries. It reads the records you already keep, from heat logs and purchases to power bills and rejections, and gives you a cost card for every casting, a quote for every new part, and an alert wherever cost is leaking.

Scroll to follow a casting

Most foundries know their price per kilo. Few know which castings make money and which lose it. The difference hides in the charge mix , the furnace meter and the rejections that come back weeks later . Foundry finds it, casting by casting.

From sand to cost card

Moulding, priced per casting

Each casting carries its own bill of materials: sand and binder, cores, sleeves, filters and coatings, priced at what you paid over the period you choose.

  • Shell, green sand and no-bake moulding
  • Cores made in house or bought in
  • Weights and methods kept with the date they changed

Reads your casting master and purchase register.

Power, from each heat's own meter

Melting energy comes from the meter reading of each heat, never added up row by row, and is shared over the kilograms melted. Power bills are read straight from the PDF.

  • Units per tonne, heat by heat
  • Demand charges kept apart from units
  • Idle months set aside, not averaged in

Reads your heat log and electricity bills.

Metal, from the charge that heat used

Scrap, pig iron, returns, ferro-alloys and inoculant are priced from what each heat actually took, at your weighted-average purchase price. Alloy freight lands where it belongs.

  • Charge mix checked against each grade's template
  • Returns credited at their metal value
  • Prices carried forward when nothing was bought

Reads your heat log and purchase register.

Rejection, charged where it was found

A casting scrapped at knockout costs less than one a customer sends back. Rejection is charged by stage, net of the metal you recover, and fixed costs are spread over the castings you actually made.

  • Internal and customer rejections kept apart
  • Metal recovery credited back
  • Fixed costs from your P&L, on real output

Reads your rejection register and P&L.

Every rupee of a casting, in its place

Every casting you make gets a card like this one, built from the heats it came from. Each layer traces back to the heats, bills and registers behind it.

Flanged bend FB-150SG 500/7 · 38.0 kg a piece
Example card · Apr–Sep 2026 · 214 pieces from 31 heats
  1. Metal61.80The charge each heat took, at what you paid
  2. Melting energy9.40Meter span of each heat, by kg melted
  3. Moulding and cores14.20This casting's own bill of materials
  4. Fettling6.10Grinding, shot blast and inspection
  5. Fixed costs11.30From the P&L, over real output
  6. Rejection4.60By stage found, net of metal recovered
  7. Packing and forwarding1.90Boxes, pallets and freight out
Cost per kg₹109.30
Selling at ₹118.50 per kg Margin ₹9.20 per kg, 7.8%

Quotes

Quote new parts on the same numbers

A part you haven't made yet is priced with the same rates as the castings you have. Once it is in production, its first cost card lines up against the quote, layer by layer.

  • One workbook in, a quote outYour estimator fills in weights, cores, process and operations. The quote is written back beside them.
  • Vendor quotes win, and say soA rate entered by hand overrides the standard one and is marked on the quote.
  • It refuses rather than guessesA missing rate stops the quote with a message naming it. No silent zeros.
RFQPump casing PC-80
Grade
SG 450/10
Weight
22.4 kg
Moulding
Green sand, 2 a box
Cores
2, bought in
Yield
61%
Finishing
Shot blast, primer
Quote₹ per kg
  1. Metal58.90
  2. Melting energy9.10
  3. Moulding and cores17.60
  4. Fettling7.40
  5. Fixed costs11.30
  6. Rejection4.20
  7. Packing2.00
Total110.50
₹2,475.20 a piece
Next RFQ not priced: no rate for Exo sleeve 6/9. Add it, or enter the vendor's quote.

Alerts

Find where cost is leaking

Eight checks run over any period you pick. Each finding is ranked Critical, Warning or Watch, and shows how far the number moved.

IntegrityApr–Sep 2026 · 8 checks · 4 findings
  • CriticalMass balanceHeat H-0912: 1,240 kg charged, 1,108 kg accounted for−132 kg
  • WarningEnergy trendFurnace 2: 642 units a tonne, up from 598+7.4%
  • WatchCharge-mix driftSG 500/7: scrap at 46%, template ceiling 42%+4 pts
  • WatchProduction gapsPower drawn on 2 days with no heats2 days
Mass balance
Metal charged against castings, returns and rejections.
Energy trend
Units per tonne drifting, and power drawn with no heat.
Rejection spikes
Rates out of pattern for a casting or a stage.
Return recovery
Runners and risers coming back outside their usual band.
Cost spikes
Heats and castings costing far more than usual.
Charge-mix drift
A grade's charge moving away from its template.
Data integrity
Records missing, malformed or entered late.
Production gaps
Days with power drawn and nothing poured.

Ask

Ask your numbers in plain words

Type a question the way you'd ask your accountant, and get the answer from your own cost cards and registers, not from guesswork.

Which castings lost money last quarter?

Three, all in SG 500/7. Rejection drove most of it: the bend ran at 9%, up from 4% the quarter before.

150 mm bend−4.10
Hub H-22−2.60
Bracket B-7−0.90
Cost cards, Jul–SepRejection register

Everything else a foundry runs on

Twelve modules on one set of numbers. Every page works on a phone as well as at a desk.

  • DashboardCost, yield and rejection at a glance
  • CostingCost cards, margins, cost pools and development write-offs
  • QuotesRFQs priced on your own rates
  • MeltingHeat log and charge templates by grade
  • RejectionsRegister, analysis and cost by stage
  • PlanningProduction plan and material requirements
  • PricesPrice master and quarterly price revisions by grade
  • CastingsCasting master and pattern assets
  • IntegrityThe eight leak checks, with exports
  • AskQuestions about your costs, in plain words
  • Import and exportTemplates in, workbooks out
  • SetupYour rates, processes and cost pools
  • Quality management (QMS)Will monitor compliance in real time, so there's no extra work before an audit and you get real value from your QMS.
  • Defect predictionWill predict defects from your foundry's own data, once you've shared a substantial amount of it.

How it's built

Refuses rather than guesses
When a price, weight or meter reading is missing, it names what's missing and stops. A silent zero on a cost line is the mistake it exists to prevent.
One engine behind every number
Cost cards, quotes and alerts come from the same engine and the same rates, so no two screens disagree.
Your records, as you keep them
It reads the exports and registers you have today. Nothing in your ERP has to change.
Units on every number
Prices quoted per tonne and per kilo are kept apart, so a thousandfold slip can't hide in a plausible figure.
One method, your settings
Every foundry is costed the same careful way. Your rates, processes and cost pools are settings you control.
Checked before every release
Sixteen automated checks re-run reconciled figures before any change ships.

Questions

Do we have to change our ERP?

No. It reads the exports and registers you keep today: the heat log, purchase register, rejection register, casting master and power bills. Nothing in your ERP changes.

Which foundries is it for?

Iron foundries pouring grey and ductile iron. It costs shell, green sand and no-bake moulding, with cores made in house or bought in.

How is a quote different from a cost card?

A cost card costs castings you have made, from the heats they came from. A quote prices a part you haven't made yet, from its RFQ. Both use the same rates, so a quote can be checked against the real cost once the part is in production.

What happens when our data has gaps?

It tells you. A missing price, weight or meter reading stops the calculation with a message naming what is missing, and the integrity checks list records that are missing, malformed or entered late.

Is the costing done by AI?

No. Costs come from a fixed, tested method you can trace line by line. AI is used where it helps: answering questions about your numbers in plain words.

Can it be used on a phone?

Yes. Every page works on a phone as well as a desktop, so the shop floor and the owner see the same numbers.

How do we start?

Book a demo. We walk you through cost cards, quotes and alerts on sample data. If it fits, you share a year of exports, and we load and reconcile them with you before you rely on a single number.